July 10th, 5-9:30 p.m.
This is dress rehearsal. I start doing more with costuming and less with tech crew. Except I set up the boxes and chocolate material river.
July 11th, 5:30-9:30p.m.
Helped with costumes. Opening Night. I set up the chocolate River and the purple mounds that go on top of the boxes. When everyone is done, I put the bridge over the gap of the platforms. Also, our Wonka shirts came in today that I designed.
July 12th, 5-9:30p.m.
Jolie is gone and I am costume mistress. I helped actors get into costumes and costume changes. I set up the stage. With what I usually do and I move the bridge during intermission to the floor. Also, before we start, I have to hot glue on some of the lights that had started to fall off the wonkavator.
July 13th, 5:30-9:30p.m.
Costume mistress. Same as other nights for costumes and stage.
July 14th, 5:30-9:30 p.m.
Costume mistress and same as other nights. But I had to hot glue some more lights back on.
July 15th, 12:30-4:30 p.m.
Final show. Was costume mistress and helped out the stage set up. After the show was had a cast party (hours not included) and I was in the dunk tank. It was a great cast party.